What is the difference between a solar proposal and a contract?
A proposal is a sales document. A contract is a legal promise. They often look alike, and some installers blend them together, so it helps to know which one you are holding before you sign anything.
The short answer
A solar proposal is the installer’s offer and sales pitch: a design, a price and a savings estimate, usually not binding on either side. The contract is the legal agreement you sign, and it is the only document that controls what you get. Before signing, check that every important item in the proposal, such as system size, equipment models, price, payment schedule, warranties and any production guarantee, is written into the contract itself. If it is only in the proposal, it may not be promised.
What a proposal is
After a site visit or a look at satellite images of your roof, the installer sends a proposal. It usually shows a picture of panels on your roof, the system size in kilowatts (kW), the expected yearly production, a price, and a savings estimate with charts. Its job is to win your business.
Proposals are useful. They let you compare offers and ask good questions. But the savings figures in them are estimates built on assumptions, such as a yearly rate increase, and the design is often a draft that changes after a closer look at your roof and electrical panel. A proposal usually says it is valid for a limited time, which our answer on how long a solar quote is valid explains.
Because proposals are built to sell, two installers can describe very similar systems in very different ways. One may show a 25-year savings total with a high yearly rate increase, while another shows first-year savings only. One may list exact panel models, another just a brand. When you compare proposals, pull out the same few facts from each: size in kW, expected yearly kWh, cash price, price per watt and equipment models. Everything else is presentation.
What a contract is
The contract is the agreement you and the installer sign. For a purchase, it may be called an installation agreement or a home improvement contract. For a lease or power purchase agreement (PPA), it is the lease or PPA itself, which can run 20 years or more. Once signed, the contract sets your rights and duties, and usually says it replaces everything said or written before it.
Lease and PPA contracts carry extra terms worth reading slowly. Look for the starting monthly payment or price per kWh, how much it rises each year (the escalator), what happens if you sell your home, who is responsible for repairs, and what it costs to end the agreement early or buy the system. These terms often matter more over 20 years than the price on page one.
That last point matters. Many contracts include a clause stating that the written agreement is the entire deal (often called an entire agreement or integration clause). If the salesperson promised a production guarantee, or the proposal showed a certain panel brand, but the contract doesn’t, you may have no right to either one.
If it matters to you, it belongs in the contract, not just the proposal or an email.
What should carry over, side by side
| Item | In the proposal | In the contract |
|---|---|---|
| System size | Estimated kW | Exact kW, or a range with a price adjustment rule |
| Equipment | Brands, sometimes “or equivalent” | Panel and inverter makes and models |
| Price | Total and price per watt | Final price, what it includes and what could change it |
| Payments | Sometimes left out | Deposit and a schedule tied to milestones |
| Production | Estimated yearly kWh | Any production guarantee, with its terms |
| Savings | Charts and lifetime totals | Usually not promised at all |
| Warranties | Summary | Full terms, length and who backs them |
| Timeline | Rough estimate | Target dates and what happens if they slip |
| Cancellation | Rarely mentioned | Your right to cancel and how to do it |
Note the savings row. Most contracts do not promise any savings, even if the proposal is full of them. That is normal, but it means the savings estimate is your job to check, not the installer’s to guarantee. Our list of what a solar contract should include goes through each item in more detail.
How the change from proposal to contract can go wrong
Most of the time, the move from proposal to contract is smooth. These are the places where problems tend to show up:
- A tablet signature. Some sales visits end with a request to “sign the proposal” on a tablet. That signature may be on the contract itself. Ask what you are signing and get a full copy first.
- “Or equivalent” equipment. The proposal names a premium panel; the contract lets the installer swap in any similar product.
- A price that can move. The contract allows the price to change after the final design, through a change order, with no clear limit. Our answer on what a solar change order is explains how to handle that.
- Missing guarantees. The production guarantee or a workmanship warranty mentioned in the proposal isn’t in the contract.
- Different financing. The loan or lease terms in the contract differ from the monthly payment shown in the proposal.
If you signed at home, the FTC’s Cooling-Off Rule gives you three days to cancel many sales of $25 or more made at your home. Our answer on signing with a door-to-door salesman covers that. Before you sign anything, work through our list of solar contract terms to check, or bring your questions to the Q&A floor.
A calm way to go from proposal to contract
- Ask for the contract as a separate document, by email, before any signing appointment.
- Lay it next to the proposal and check each row in the table above.
- Write down every difference and ask the installer to explain it in writing.
- Ask for any promise that matters to you, such as a named panel model or a production guarantee, to be added to the contract.
- Sign only when the contract matches what you agreed to, and keep a full signed copy.
A good installer won’t mind this. Taking a few days to read a contract that may run for 20 years or more is not being difficult. It is simply what careful buyers do. If someone tells you the price or offer will disappear unless you sign today, that pressure is itself a reason to slow down.
When the proposal’s numbers don’t hold
- The contract allows a smaller system or cheaper equipment than the proposal showed, at the same price.
- The savings in the proposal rely on a 30% federal tax credit that ended for owned systems installed after December 31, 2025.
- The contract’s final price rises after a change order, stretching your payback.
- The production guarantee in the proposal never made it into the contract.
Your payback rests on what the contract promises, not on what the proposal shows.
Key takeaways
- A proposal is a sales estimate; the contract is the binding agreement.
- Most contracts say they replace everything said before, so anything left out may not count.
- Check that size, equipment models, price, payments and warranties match between the two.
- Contracts rarely promise savings, so check the estimate yourself.
- Get a full copy of anything you sign, including on a tablet.
Questions people also ask
Is signing a solar proposal binding?
It depends on what the document says. Some proposals are just offers with no signature line. Others include a signature page that turns them into a contract, or an agreement to pay a design fee. Read the page you are asked to sign. If the word agreement, contract or terms appears, treat it as binding until you are sure it isn’t.
Can I ask for changes to a solar contract?
Yes. You can ask the installer to name exact equipment models, add a production guarantee, tie payments to milestones or add a price cap on change orders. Many installers will agree to reasonable requests. Get any change written into the contract or a signed addendum, not just confirmed in an email or a phone call.
Should the contract match the proposal exactly?
The key terms should match, or any difference should be explained in writing. Small changes in panel count after a final roof survey are normal. But a change in equipment brand, total price or warranty length is a big deal. Ask about any difference before you sign, and get the answer in the contract.
Sources