Can I remove panels to redo my roof?
If your roof wears out before your solar system does, the panels can come off and go back on. It is a normal job, but it takes planning, the right crew and some paperwork.
The short answer
Yes. Solar panels can be taken down, stored and reinstalled so your roof can be replaced, and it is a common job. It should be done by a licensed solar installer, ideally the one who put the system in, working in step with your roofer. Expect the system to be off for days to a few weeks, and expect a cost for the removal and reinstall that is separate from the roof itself.
How a remove-and-reinstall job works
This job is often called a detach and reset, or an R&R. It follows the same order on most homes.
- Shutdown. The solar crew switches off the system at the inverter and disconnects, so the wiring on the roof is safe.
- Removal. They unbolt the panels, label them, take out the wiring and remove the racking and roof attachments.
- Storage. Panels are stored on the ground or taken to the installer’s yard. They should be kept flat or upright as the maker recommends, away from foot traffic.
- Reroofing. Your roofer tears off and replaces the roof, including the flashing points where the new attachments will go.
- Reinstall. The solar crew puts new or reused mounts and flashing in place, sets the racking, reinstalls the panels and reconnects the wiring.
- Inspection and restart. Many towns want a permit and inspection for the reinstall. Once it passes, the system goes back on.
The best results come when the solar crew and the roofer talk before anyone climbs a ladder. The roofer needs to know where attachments will land, and the solar crew needs a schedule.
Who should do the work
Most roofers are not licensed to handle solar electrical work, and most solar installers do not replace roofs. You usually need both. Here is how to choose.
- Your original installer first. They know the system, may hold design files and permits, and their workmanship warranty may require that they do the removal. Check your contract.
- Another licensed solar installer if the original is gone. Ask them to inspect and photograph the system before removal so any existing damage is documented.
- A roofer who has worked around solar before. Ask how they handle the attachment points and flashing, and whether their roof warranty covers those spots.
Roof warranties are a real concern here. If the roofer’s warranty excludes leaks at solar mounts, and the solar installer’s warranty excludes the new roof, you may end up with a gap. Ask both in writing who covers what. For more on this, see will solar void my roof warranty.
If the panels are leased or on a power purchase agreement, you usually must notify the company that owns them before anyone touches the system. Many agreements set out who does the work and who pays.
What it costs and what you lose
Removal and reinstall prices vary a lot by system size, roof type, access and region, so get written quotes. The real cost has two parts: the job itself, and the power you do not make while the system is down. Our answer on what it costs to remove and reinstall solar breaks the price down further.
Example: reroofing under the standard system
- Standard example home: 8 kW system, 20 panels, saving about $1,660 a year at 16¢ per kWh
- Example assumption: removal and reinstall quote of $4,000, including a new permit
- Example assumption: system offline for 3 weeks in spring
- Lost savings: about 3/52 of a year, or about $95
Example total cost of the solar side: about $4,100, on top of the roof itself
Example only. Your quote may be higher or lower. Lost savings are larger in summer and smaller in winter.
In this example, the cost is about two and a half years of the system’s savings. That is why it usually pays to replace an aging roof before solar goes on. If you are still at the planning stage, read should I replace my roof before solar and our guide to roof age before going solar.
How long the whole job takes
Most of the waiting in a remove-and-reinstall job is scheduling, not work. The hands-on parts are fairly quick. On a typical home, a solar crew can often take a system down in a day, and the reinstall usually takes one to two days. The roof replacement in between depends on the roofer, the weather and the size of the roof.
What stretches the timeline is everything around the work: getting the solar crew and the roofer on the same calendar, waiting for a permit for the reinstall, booking an inspection, and weather delays that push the roofer back. A gap of a few weeks between removal and restart is common, and longer gaps happen when permits are slow or the roofer finds rotten decking that needs extra repair.
Keeping the gap short
- Book the solar crew first, since they often have the longer wait, then fit the roofer around them.
- Ask the solar installer to apply for the reinstall permit before removal day.
- Ask the roofer to flag any decking repairs as early as possible so the reinstall date can move with them.
- Agree on a target restart date in writing, and who calls whom if it slips.
In many cases your utility agreement stays in place while the system is off, and a like-for-like reinstall does not mean reapplying for net metering, but confirm with your utility. If the installer changes your equipment or adds panels at the same time, that can count as a modification, so ask before you assume.
Before you book the reroof
A little preparation keeps the job smooth and protects your warranties.
- Photograph the system and take a screenshot of your monitoring app showing normal output, so you can compare afterward.
- Ask the solar crew whether any parts, such as old mounts, flashing or connectors, will be replaced, and what that adds.
- Confirm who pulls the permit for the reinstall. See do I need a permit for solar panels.
- Check with your utility whether you need to tell them the system will be off or changed. Most simple reinstalls do not affect your agreement, but ask.
- Get the panel maker’s handling rules from the installer, since some warranties require a qualified installer to move panels.
- After restart, watch your monitoring for two to four weeks to confirm every panel is producing.
For more short answers on roofs and equipment, visit the Q&A floor.
When a remove-and-reinstall is a poor deal
- The system is old, its inverter is failing and the reinstall costs close to what new, more efficient panels would.
- You are selling soon and a buyer would value a new roof without solar more than the remaining savings.
- The original installer is gone and the panels are discontinued, making warranty claims after reinstall difficult.
- Your roof needs replacing within a year or two of a new install, which means paying for removal you could have avoided.
When the system is near the end of its life, compare the reinstall price with the cost of a new system before deciding.
Key takeaways
- Panels can be removed and reinstalled for a new roof; it is a routine job for a licensed solar installer.
- Coordinate the solar crew and roofer early, and get both warranties in writing.
- Budget for the removal and reinstall and a few weeks without solar savings.
- If your roof is near the end of its life, replacing it before going solar usually saves money.
Questions people also ask
Can my roofer remove the solar panels?
Some roofers offer it, but solar removal involves electrical disconnection and, often, a permit and inspection to reinstall. Many solar warranties also require a qualified installer to handle the equipment. It is usually safer to have a licensed solar company do the removal and reinstall while your roofer handles the roof, with both working from the same schedule.
Will the panels work the same after reinstall?
They should, if handled and stored properly. Panels can be damaged by being stepped on, dropped or stacked carelessly, so ask how they will be stored. After the restart, compare your monitoring numbers with the screenshots you took before removal. A drop in output on similar sunny days is worth reporting to the installer right away.
Should I add panels while they are off the roof?
It can be a good moment, since the crew is already there and the roof is new. Adding panels changes your design, may need a larger inverter and usually requires a new permit and utility approval. Ask for a separate price, and check whether new panels will match the older ones closely enough to work well together.
Sources

Ready for real numbers on your roof?